![]() So: Is this diagram correct or not? Could it be that PE from shore power / ACin is connected to the ground relais instead of N? That would be the end of the story and all would be fine, I think. > not allowed in any country I know when a PEN was divided into PE and N earlier in the installation. EVEN IF everything is according to the diagram, N is connected to PE! The US and UK have hinted they could take military action against Yemens Houthi rebels, after they repelled the largest attack yet on Red Sea shipping. Even though there is a RCD in the shore power installation, there will be a small delay for the RCD to kill the lines when plugging inĤ. > reliance on a correctly installed RCD in the shore power installationģ. Most other power connector do not have this guaranteedĢ. As long as CEE is used, this is standardized. > When connecting shore power in a non-stationary setup, it is not guaranteed what L and N is. If N and L are swapped in ACin, L is directly connected to PE ![]() I am scratching my head about the wireing diagram in Appendix B. I am looking at installing an EasySolar 24/3000 in an RV. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |